
Quick belt change conveyor
With a belt change time of UNDER 10 MINUTES this unique conveyor also ensures minimum downtime saving significant maintenance costs per year.
*BENEFIT – Only ONE PERSON REQUIRED to carry out the BELT REPLACEMENT.
“ The Optima conveyor is an impressive piece of engineering that helps both maintenance teams and the airline industry ”
Senior Airport Engineer
Features
• Minimal downtime
• Ultra-fast belt replacement
• Modular construction
• Low total cost of ownership
• Easy belt tensioning from one side
• Designed by engineers for engineers
• Any length available
• Incline and decline models available
case study - BAA Southampton 
optima leaflet  |